Industrial

No

Project Name

Location

Client

Description

Cost (mech)

1

Israh Factory for carton – Obonr.
 

CAIRO

DR. AHMED SAAD Consult
 

HVAC, Plumbing and fire fighting
 

1,300,000 LE
 

2

Al Salam Factory for houses - Obur
 

CAIRO

DR. AHMED Consult
 

HVAC, Plumbing and fire fighting
 

680,000 LE
 

3

Packaging Factory (Eng. Salem ) – 10 th of Ramadan
 

CAIRO

DR. AHMED Consult
 

HVAC, Plumbing and fire fighting
 

960,000 LE
 

4

KADY Factory for Hoses ( Eng. Magdy ) – Obur
 

CAIRO

Eng. Magdy Khalil
 

Ventilatien

200,000 LE
 

5

KARAMA Factory for cheese – Obur
 

CAIRO

DR. AHMED SAAD Consult
 

HVAC, Plumbing and fire fighting
 

2,400,000 LE
 

6

Lokma Factory - Kattamya
 

CAIRO

DR. EMAM Soliman
 

HVAC, Plumbing and fire fighting
 

3,400,000 LE
 

7

Site Utilities and networks ( Water, Drainage , Fire, Steam , Vacuum, ..etc)
 

CAIRO

DR. EMAM Soliman
 

Water, drainage, fire fighting network
 

1,300,000 LE
 

8

Main Slauter House
 

CAIRO

AL AHRAM Co
 

Plumbing and fire fighting
 

680,000 LE
 

9

Lo Carnaval Pastry Center – Roxy.
 

CAIRO

CONCEP Consultant
 

HVAC, Plumbing and fire fighting
 

1,300,000 LE
 

10

Sika factory – Obour (project value SR. 110 million)
 

CAIRO

INTER Desigh group
 

Factory for chemical compounds , administration building, 3 Floors and site utilities and   chemical treatment. Total Building area 300,000
 

2,400,000 LE
 

11

Pipe Factory Administration building with its mechanical service
 

CAIRO

DR. AHMED SAAD Consult
 

HVAC, Plumbing and fire fighting
 

980,000LE
 

12

Taiba for Gold Jewels Co. LTD (Project Value SR. 74.000.000)
 

JEDDAH
SA

SC

Preliminary & Detailed design and preparation of construction documents for a 15000 Sq.m, two story factory and 26000 sq.m. of site. Systems included potable water, row water, industrial water, fire water, industrial gases, chilled water system, power, lighting, telecom system, etc.
 

4,870,000 SR
 

13

Milk Factory
 

Alexandria

AlfaPanel Co.
 

Milk production factory with farm of CAW and admin building
 

2,340,000 LE

14

Plastic factory
 

JEDDAH
SA

AL GAAFARY

Design of HVAC and Fire Fighting and plumbing for FACTORY 2000 M2 , ADMIN BUILDING AND STORES
 

6,800,000
LE

15

Refrigerator al abeer
 

JEDDAH
SA

al abeer group

Design HVAC and Fire Fighting and plumbing for Refrigerators for fruits and meat  stores
 

4,200,000
LE

16

Factory of glass in 10 of Ramadan

Cairo

The Arabia company

Design of water station and tanks for Factory of glass
 

3,200,000
LE

17

Carina factory for clothes

Cairo

Carina

Design of HVAC and Fire Fighting
 

700,000
LE

18

Hose pipe el slam factory

Cairo

Eng. Magdy khalil

Design of HVAC , Fire Fighting and plumbing
 

2,300,000
LE

19

Loryal factory in 10 of ramdan

Cairo

Loryal factory

Review of fire fighting system
 

4,500,000
LE

20

Marcedes stores

Cairo

Marcedes company

Supervision of fire fighting system
 

2,300,000
LE

21

Swede for cables

Cairo

Swede company

Design fire fighting system

1,800,000