Supervision

  • A- Supervision of mechanical systems include:

1- Air conditioning system

  • Central Air conditioning units
  • Air distribution and grills.
  • Chilled water / Refrigerant pipe networks
  • Air ducts and accessories

2- Water supply system

  • Water piping system from main to all fixture units
  • Pumps and water tanks as per demand and pressure required
  • Details of accessories, valves … etc in duct shaft
  • Hot water systems, Boilers, water heaters, piping network

3- Drainage  system

  • Drainage piping system from main to All fixture units
  • Inspection chamber, manholes, profiles… etc
  • Lift stations
  • Details of fittings and accessories

4- Fire Fighting system

  • Fire system piping from main to all spaces inside building and fire hydrant
  • Pump station and fire tanks
  • Detail of fittings and accessories
  • Gas fire fighting FM200,CO2

5- Irrigation System include

  • Piping network from tank to irrigation area
  • Pumps and water tanks
  • Detail of fittings and accessories
  • Irrigation by sprinklers
  • Drip irrigation

6- Swimming Pools and Fountains include

  • Piping network to and from pools, fountains and water falls
  • Pumps, filters, chlorination and heating systems
  • Fittings accessories and valves
  • B- Electrical systems :

1- Light current systems include:

  • Fire Alarm system network
  • Telephone system network
  • TV system network
  • CC TV system
  • Intercom system
  • Data network
  • Sound system

2- Low Tension network include:

  • Details of  MDB, feeders …….etc
  • Details of  MCC panels
  • Low tension cables network

3- Power and Lighting system

  • Inside and outside lighting system
  • Power sockets inside and outside at landscape
  • Power source for service rooms and pump rooms
  • General Supervision Items ( For All Systems ) :
  • Technical and financial analysis of contractors offers and recommend at ion for the best offer
  • Execution time schedule approvals
  • Approval of shop drawing
  • Approval of materials to be installed
  • Site visits to supervise the installation to include:

    • Meeting with sub contractors and suppliers
    • Follow up the exaction time schedule
    • Check installation at site as per approved shop drawings
    • Technical instruction for proper installation
    • Test of installation
    • Contractor statement approvals
    • Initial handover of systems
    • Check and approve As Built drawings
    • Final Acceptance of the protect